• Home
    • Cart

      0
Have any question?
+91 7979801035
info@internationalsbc.org

Career |Shop| Courses | Accredited Organizations

Internationalsbc

    • Home
    • Cart

      0

green sez

  • Home
  • Blog
  • green sez

green sez

  • Posted by Hostinger Admin
  • Date May 18, 2022
  • Comments 1 comment

COURTESY  :  usolar.in/

Green sez

The first EPZ (Export Processing Zone) in Asia was setup in 1965, in Kandla, Gujarat. Since then, over 170 SEZs (Special EconomicZones) have been set up in the country, contributing to billions of dollars ofexport earnings and creating close to a million jobs. The objectives of setting
up SEZs remain broadly the same:  to generate more economic activity,
export earnings, job opportunities and foreign investments.  With over 600
more SEZs approved by the Government, this sector is poised for enormous growth
in the coming years.

The intensive energy needs of SEZs form a strong
challenge for the Government, as high service levels have to be maintained in
terms of energy availability, balanced with the Government’s obligation to
continue to provide power for residential, institutional and commercial
consumers in the domestic tariff areas, i.e. outside the SEZs. To address the
objectives of sustainability as well as lesser energy dependence of SEZs, in
2009, the Government established draft guidelines for “Green Special Economic
Zones”.
 The Guidelines stated that at least 25% of the external lighting load
should be solar powered and that each SEZ has to install a solar power system
to generate a minimum of 50 kilowatt per hectare The plan never came into
effect and was shelved two years later. 

 In these circumstances, it is indeed an excellent and
most heartening development that a leading SEZ has proactively made the
decision to install a massive captive solar PV power plant to provide clean
energy to its occupants.

Shriram Gateway, a 58 acre SEZ project at
Chennai with 6 million sq.ft. of IT/ITES SEZ offices and about 2.5 million
sq.ft. of residential development, has commissioned a 700 KWp solar PV power
plant, designed and implemented by U-Solar Clean Energy Solutions using the Build
Own Operate and Transfer (BOOT) model
.
  To avoid the steep initial cost of installing such
a huge rooftop solar power plant, the SEZ has signed long term PPAs (15 to 25
years) with different third party energy companies. The plant has been
installed with solar modules from different manufacturers like
Waree Energies ltd, Shan Solar & CNPV Power SA along with grid connected
inverters from SMA  & DELTA.

The 700 kW system has been installed on six block (A1,
A6, B1, B6, B4 & B5). The first 400
kW was commissioned on A1, A6, B1 & B6 in October 2014 and the latest 300
kW installation has been commissioned on Building B4 & B5 in March 2015. The
SEZs pays a monthly bill to the energy companies for the metered solar power.
The following model offers no high upfront capital expenditure, maintenance and
operations are the responsibility of the EPC, unit price of solar is below grid
price and the power plant is transferred after the duration of PPA. Apart from
this, the rooftop solar PV system helps reduce vast diesel consumption from
generators as well as power consumption from the grid for operation of the facility. 

  • Share:
Hostinger Admin

    Previous post

    Green residential societies
    May 18, 2022

    Next post

    Green economy
    May 19, 2022

    You may also like

    figure-3
    Urban heat local food production
    25 November, 2022
    Vibrant Agro industry
    24 November, 2022

    Vibrant Agro industry courtesy : Vibrant Agro industry Diokno: Vibrant agriculture, sustained economic growth, key to poverty reduction Finance Secretary Benjamin Diokno stressed the critical role of a robust agriculture industry in growing the economy at a sustainable and inclusive …

    download (7)
    Waste recycling
    24 November, 2022

      1 Comment

    1. zoritoler imol
      May 21, 2022
      Reply

      I’m not sure exactly why but this web site is loading extremely slow for me. Is anyone else having this problem or is it a issue on my end? I’ll check back later on and see if the problem still exists.

    Leave A Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    Search

    Categories

    • No categories

    Contact Us

    B-401,Om Kavery CHS Ltd Vijay Nagar, Nallasopara (E) Mumbai, India-401209

    Mob:-+91 7979801035

    Phone:-+91-250-2341257

    Whatsapp :-+91 8369083940

    info@internationalsbc.org

    Main Menu

    Home
    About Us
    Accreditation Programs
    Training
    Shop

    Quick Links

    Career
    Contact Us
    News
    Grab A Franchise
    Become A Investor
    News

    Privacy Policy

    Copyright © 2020 International sustainable Building Council

    WhatsApp Email Us Callback Request Call Now
    Please enter your phone number and we will call you back soon

    Thank you

    We will call you back soon

    Please enter valid phone number