• Home
    • Cart

      0
Have any question?
+91 7979801035
info@internationalsbc.org

Career |Shop| Courses | Accredited Organizations

Internationalsbc

    • Home
    • Cart

      0

Environmental assessment and site selection

  • Home
  • Blog
  • Environmental assessment and site selection

Environmental assessment and site selection

  • Posted by Hostinger Admin
  • Date June 10, 2022
  • Comments 0 comment

Couertsy: rhdhv.co.za

The Scoping phase of the EIA Process identified the potential positive and negative
environmental (biophysical and social) impacts associated with the proposed establishment of
a CSP plant and associated infrastructure in the Siyanda District. A number of issues for
consideration were identified by the environmental team and/or raised by I&APs during the
PPP. This section serves to outline the approach utilised to evaluate the alternative sites and
select a preferred site for the establishment of the proposed CSP plant and associated
infrastructure.
The potential environmental impacts of the CSP plant and associated infrastructure were
considered in the nomination of a preferred site for the construction of the CSP plant, as well
as in determining which further studies would be required in the EIA phase.
The Scoping phase evaluated two alternative sites for the proposed Solafrica CSP project:
• Site 1: Farm Olyvenhouts Drift (west of Upington), and
• Site 2: Farm Bokpoort 390 (north west of Groblershoop).
In order to establish the best environmentally and technically practicable site to evaluate in
the EIA phase, site specific evaluations were undertaken for each of the alternative sites. The
process involved a range of physical, biological, social and technical criteria.
5.1.1.1 Site Evaluation – Field Studies
The two alternative sites were inspected by the specialists in order to:
• Investigate the study area;
• Gather baseline environmental (biophysical and social) information for the sites;
• Assess the status quo conditions, and
• Identify any potential environmental impacts.
5.1.1.2 Specialist Studies
The choice of specialist studies undertaken during the environmental assessment process
was influenced by the need to cover all aspects of the environment namely: physical,
biological and social. Table 16 outlines the variables or issues that were investigated by 11
specialist studies utilised in determining the preferred site for the CSP plant deployment.

  • Share:
Hostinger Admin

Previous post

energy management
June 10, 2022

Next post

Climate Change
June 10, 2022

You may also like

figure-3
Urban heat local food production
25 November, 2022
Vibrant Agro industry
24 November, 2022

Vibrant Agro industry courtesy : Vibrant Agro industry Diokno: Vibrant agriculture, sustained economic growth, key to poverty reduction Finance Secretary Benjamin Diokno stressed the critical role of a robust agriculture industry in growing the economy at a sustainable and inclusive …

download (7)
Waste recycling
24 November, 2022

Leave A Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Categories

  • No categories

Contact Us

B-401,Om Kavery CHS Ltd Vijay Nagar, Nallasopara (E) Mumbai, India-401209

Mob:-+91 7979801035

Phone:-+91-250-2341257

Whatsapp :-+91 8369083940

info@internationalsbc.org

Main Menu

Home
About Us
Accreditation Programs
Training
Shop

Quick Links

Career
Contact Us
News
Grab A Franchise
Become A Investor
News

Privacy Policy

Copyright © 2020 International sustainable Building Council

WhatsApp Email Us Callback Request Call Now
Please enter your phone number and we will call you back soon

Thank you

We will call you back soon

Please enter valid phone number