• Home
    • Cart

      0
Have any question?
+91 7979801035
info@internationalsbc.org

Career |Shop| Courses | Accredited Organizations

Internationalsbc

    • Home
    • Cart

      0

Construction on Zaha Hadid Architects’ Masaryčka Building is Underway

  • Home
  • Blog
  • Construction on Zaha Hadid Architects’ Masaryčka Building is Underway

Construction on Zaha Hadid Architects’ Masaryčka Building is Underway

  • Posted by Hostinger Admin
  • Date October 23, 2021
  • Comments 1 comment

Courtesy :archdaily

Construction on Zaha Hadid Architects’ Masaryčka Building is Underway

Save this picture!

Construction on Zaha Hadid Architects' Masaryčka Building is Underway , © Studio Horak

  • Written by Dima Stouhi
  • 3 days ago
Share

Construction on Zaha Hadid Architects‘ Masaryčka building in Prague has reached level three, with completed work on the retail levels on the ground and first floors, and ongoing work on the higher floors, which include cantilevered offices and terraced roof gardens. The 28,000 sqm project, which will replace an existing car park, is expected to open in 2023 with a structure that rises seven storeys towards its eastern section and nine storeys at its western end.

The architecture is defined by circulation routes that expand throughout the site, providing access to new civic spaces within the city’s major transport hub. The design aims to provide a new pedestrian route between Na Florenci Street in the north and Hybernská Boulevard to the south, enhancing the circulation and accessibility to the station’s platforms. This newly-introduced urban layout and its integration with the existing Czech Railways will create a new public park over the tracks that stands as a welcoming gateway to the city.

Save this picture!

© Studio Horak

ZHA’s design creates a dialogue between the urban fabric of Prague’s Old Town, known as ‘the city of 100 spires’, and the external “fins” within Masaryčka’s façade, transforming the project’s horizontal composition into a harmonious layout. Lush trees and shrubs are planted excessively throughout the site, providing the new district with shade and natural air purification. The plants will be irrigated by rainwater collection, and the centre will be supported with low-flow systems and grey-water recycling, further reducing water consumption.

  • Share:
Hostinger Admin

Previous post

Upside down, rotating backwards: How Earth looks like from Moon's South Pole
October 23, 2021

Next post

A Vast “Magnetic Tunnel” May Surround Earth and Our Entire Solar System
October 24, 2021

You may also like

figure-3
Urban heat local food production
25 November, 2022
Vibrant Agro industry
24 November, 2022

Vibrant Agro industry courtesy : Vibrant Agro industry Diokno: Vibrant agriculture, sustained economic growth, key to poverty reduction Finance Secretary Benjamin Diokno stressed the critical role of a robust agriculture industry in growing the economy at a sustainable and inclusive …

download (7)
Waste recycling
24 November, 2022

    1 Comment

  1. yolsaly
    April 8, 2022
    Reply

    yolsaly b0da67c006 https://marketplace.visualstudio.com/items?itemName=Anubis91.Bubble-Color-World-fiapeti

Leave A Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Categories

  • No categories

Contact Us

B-401,Om Kavery CHS Ltd Vijay Nagar, Nallasopara (E) Mumbai, India-401209

Mob:-+91 7979801035

Phone:-+91-250-2341257

Whatsapp :-+91 8369083940

info@internationalsbc.org

Main Menu

Home
About Us
Accreditation Programs
Training
Shop

Quick Links

Career
Contact Us
News
Grab A Franchise
Become A Investor
News

Privacy Policy

Copyright © 2020 International sustainable Building Council

WhatsApp Email Us Callback Request Call Now
Please enter your phone number and we will call you back soon

Thank you

We will call you back soon

Please enter valid phone number